Dear ALL:

We are planning for Clean Labs shutdown at the end of this week; proposed dates are 22nd & 23rd March
2019 (Fri-Sat). During this shutdown, the electrical shutdown will be on 22nd March only whereas AHUs shutdown
will be for both the days.

During shutdown UPS engineer will configure all the three UPS on 22nd and at the same time Axenic
people will clean & service all the AHUs/MAUs after cleaning area below the raised floor on 22nd &
23rd.

HeIBL Application Training

Dr Vignesh Viswanathan, Applications Specialist (Materials Electron Microscopy) at Carl Zeiss, Singapore and his team will visit C4DFED and provide the application training on HIBL system from 1 April to 6 April 2019.

 

Thanks

C4DFED

HeIBL Application Training

Dr Vignesh Viswanathan, Applications Specialist (Materials Electron Microscopy) at Carl Zeiss, Singapore and his team will visit C4DFED and provide the application training on HIBL system from 1 April to 6 April 2019.

 